General Civil
-
Site Development Commercial Business Park – Santa Rosa, CA
Project engineer for site grading, roads, parking and utilities (water, sewer and storm drainage) for several commercial projects in the business park.
-
Subdivisions, Apartment Complexes, and Miscellaneous Site Developments – Modesto, CA
Water, sewer, grading and drainage design for subdivisions, apartment complexes and other miscellaneous site developments.
-
Lanai Municipal Solid Waste Landfill – County of Maui, Lanai, HI
Design project manager for a new four-acre landfill; one-mile, paved site access road; water supply (well) and storage; wastewater and storm drainage facilities, as well as other ancillary landfill facilities. Also, closure of the adjacent existing dump/landfill. The design was fast-tracked and completed within a period of about four months to meet the client’s needs.
-
Aircraft Wastewater Receiving Facilities – Port of Seattle, SeaTac, WA
Project engineer/manager for predesign and final design of aircraft wastewater receiving facilities, pump station and forcemain. Project included site grading and paving, retaining walls, storm drainage and water supply (air gap system). Provided typical engineering construction support services during construction.
-
Juanita Bay Pump Station Replacement – Brown and Caldwell/King County, Kirkland, WA
Project manager/engineer for predesign (30% plans) for on-site site grading and drainage, water and sewer utilities, as well as off-site street improvements, water, sewer and 60-inch influent sewer that required microtunneling. Also, assisted with the predesign of a secant pile wall shoring system that was needed for constructing the pump station as well as for […]
-
Site Development Lake County Main Jail – Lake County, CA
Project engineer/manager for site grading, roads and utilities (water, sewer and storm drainage) for a new jail complex. To expedite construction, rough grading plans and specifications were developed to allow the site’s mass excavation and fill (~45,000 CY) to proceed before the final design was completed and approved. Provided limited review and construction assistance.