Project Description

Project engineer/manager for preparation of a preliminary sewer and water system study for the East Highway 50 basin/service area (473 acres). The study investigated and evaluated alternatives and determined sewer collection and water distribution system improvements. The water system was modeled, and improvements were determined using WaterCAD. Improvements for two different land use scenarios were investigated. Water system improvements consisted of 39,000 feet of 8 through 16-inch water mains and appurtenances (PRVs) with project costs estimated at over $12 million.

Sewer system improvements consisted of 35,000 feet of 8 to 24-inch gravity sewers with project costs estimated at over $20 million.

Project Details

Categories
Location Carson City, NV