Project Description

Project manager/engineer for predesign (30% plans) for on-site site grading and drainage, water and sewer utilities, as well as off-site street improvements, water, sewer and 60-inch influent sewer that required microtunneling. Also, assisted with the predesign of a secant pile wall shoring system that was needed for constructing the pump station as well as for structural requirements.

Project Details

Categories
Location Kirkland, WA